Rehabilitation of Sewer Network Project of area 761
Rehabilitation of Sewer Network Project of area 761
The work was executed by Kunzite General Contracting Company, which included laying pipes for sewage service in the Al-Fadiliyah neighborhood with various diameters according to specifications and within the specified timelines under the supervision of the resident engineer. The project was finally delivered in 2021 upon completion of the execution period. The Sewer Network Project in District 761 – Al-Fadiliyah is considered one of the largest infrastructure projects executed by our company and our staff exclusively, within the specified timeframe and under the supervision of the resident engineer. The project consists of transmission lines with different diameters ranging from 250 mm to 500 mm, connected to the main carrier line for Baghdad, which is the Khansaa line. Inspection chambers are distributed along the pipes, totaling up to 700 chambers with varying dimensions and diameters based on the approved designs by the Capital Municipality.