Rehabilitation of Sewer Network Project of area 770
Rehabilitation of Sewer Network Project of area 770
The project was referred in 2013 with an execution period of 18 months during which the project was implemented according to the required specifications, using the company›s machinery and its workforce exclusively, under the supervision of the resident engineer and within the required time frame. The project consists of a main transmission line connected to the main carrier, branching into subsidiary lines with various diameters ranging from 250 to 700 mm, depending on density, with over 85 inspection points and distribution manholes along the route.
Year2023Scope of workRoad & Infrastructure WorksClientCapital MunicipalityContract statusMain contractorShare